Estimates & Proposals
Applying an Assembly to a Takeoff
Price a takeoff from your price book. The takeoff takes the assembly's name, and its row on the estimate worksheet picks up the pricing.
Steps
- In the takeoff viewer, start a takeoff or select one in the Takeoffs tab so the Measure panel is open on the right.
- Pick an assembly from the Assembly dropdown. The takeoff is renamed to the assembly's name.
- Open the ESTIMATES tab. The takeoff's row fills in the assembly's labor and material rates, pricing methods, waste, and the CSI code of its section.
Notes
- •The unit has to match what the takeoff measures: EA assemblies go on counts, LF on lines, linears, and Linear with Drop, and SF, CF, or CY on areas, Surface Area, Volume 2D, and Volume 3D. A mismatch is blocked with an explanation.
- •An hourly or per-each rate arrives as Per Qty, so enter the hours or quantity on the worksheet row.
- •If the row already had anything entered (a rate, waste, CSI code, or pricing method) before you applied an assembly, it is left as it is. Once a row has been filled from an assembly, switching the takeoff to a different assembly refills its labor, material, and waste (and its CSI code when the new assembly's section has one), replacing your edits to them.
- •Choose No assembly to take it off; the takeoff gets its earlier name back. Rates already on the worksheet stay until you change them.
- •Editing an assembly later does not change takeoffs or estimates already priced with it.
- •No assemblies yet? Create them under Assemblies in the Workspace menu, or save an estimate row as one.